Hellerówka
Description
The spatial character of the establishment resulted from aspiration to minimalise the explosion risk and effects. Several parts of the production process was divided into two separated small buildings. Technological links relied on underground tunnels. This was an example of production line. All of the buildings were situated on a different relief.